Air quality
Ambient air-quality measurements and baseline conditions to inform assessment of mining-related emissions and dust.
Environmental and social assessment for MJAM’s Mes Aynak copper project in Logar: multidisciplinary baseline studies, screening, scoping, stakeholder consultation, an ESIA Report and an Environmental and Social Management Plan.
Daira Sabz Consulting & Engineering Group delivered environmental and social assessment services for MCC-JCL Aynak Minerals Company (MJAM) at the Mes Aynak copper project in Logar, Afghanistan. The assignment connected multidisciplinary baseline studies with screening, scoping, impact assessment, mitigation planning, public consultation and disclosure.
The baseline programme examined physical, biological, socio-economic and cultural conditions, providing evidence to identify sensitive receptors and assess potential mining impacts. Field measurements, sampling, laboratory services and stakeholder consultation brought technical findings and community perspectives into the assessment.
Climate-change profiling and disaster-risk analysis examined flood, landslide and operational risks. Dedicated waste and tailings studies informed recommendations for pollution control, sustainable mine planning and environmental management. These specialist assessments complemented the baseline programme.
The report package comprised Baseline Studies Reports, a Screening Report, a Scoping Report, an Environmental and Social Impact Assessment (ESIA) Report, and an Environmental and Social Management Plan (ESMP).
Documentary: Aynak Copper Deposits’ Environmental and Social Impacts Assessment — https://youtu.be/fA5pcWFjF5c
Documentary: Aynak 1 Copper-ESIA — Public Consultation for a Sustainable Future — https://youtu.be/LqdjAZslZ8w
The documented baseline programme covered the following areas. Climate, disaster-risk and waste/tailings studies provided additional specialist inputs to the ESIA.
Ambient air-quality measurements and baseline conditions to inform assessment of mining-related emissions and dust.
Baseline noise measurements to support assessment of potential disturbance and mitigation needs.
Assessment of water-resource and hydrogeological conditions within the project’s influence area.
Water and sediment sampling and analysis in riverine systems, supported by environmental laboratory services.
Soil field investigation, sampling and characterisation to establish existing soil conditions.
Geochemical baseline investigation to inform the assessment of potential environmental risks associated with mining.
Ecological baseline assessment, including flora, fauna and biodiversity observations.
Assessment of social and economic conditions and community perspectives relevant to project impacts.
Assessment of transport-corridor conditions relevant to mining activities and associated impacts.
Characterisation of the existing landscape and visual setting to inform impact assessment.
Assessment of cultural-heritage conditions and potential mining impacts in the Mes Aynak area.
The assignment connected technical evidence, public participation and management recommendations through the ESIA process.
Identify assessment needs, key issues and the scope of environmental and social investigations.
Bring together specialist surveys, field measurements, sampling, laboratory analysis and social information.
Evaluate potential impacts, climate and disaster risks, and waste/tailings issues; develop mitigation recommendations.
Engage local communities, relevant authorities and other stakeholders, and incorporate their perspectives into the assessment process.
Consolidate assessment findings and translate mitigation and management recommendations into the ESIA Report and ESMP.
A complex copper project requires more than isolated surveys. By integrating baseline evidence, community perspectives and management planning, Daira Sabz helped establish a structured basis for assessing risks and informing responsible project decisions.
Project photographs documenting site conditions, baseline surveys, environmental sampling, biodiversity observations and stakeholder engagement.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Herat Province, Afghanistan
Feasibility-stage ESIA for MJAM’s Baghdara Hydropower Project in Parwan and Kapisa, combining environmental and social baselines, laboratory analysis, climate and disaster-risk assessment, and practical safeguards planning.
Kapisa and Parwan, Afghanistan
Environmental and social assessment for the Jare Takhomak marble mine within Ghaznawi Farah’s Herat project, combining baseline studies, field monitoring, consultation and support for NEPA review.
Herat, Afghanistan
Discuss your project stage, study area and assessment needs with Daira Sabz—from screening and baseline investigations to consultation, ESIA reporting and environmental and social management planning.