رفتن به محتوا
Case Study – Environmental Monitoring

ESIA مس عینک — فاز اول خط پایه

Comprehensive environmental and social baseline for one of the world's largest undeveloped copper deposits, aligned with IFC Performance Standards.

ESIA مس عینک — فاز اول خط پایه
Project Overview

Supporting safe, compliant health infrastructure

Daira Sabz Consulting and Engineering Group provided environmental monitoring services under a structured sub-consultancy assignment with an international engineering partner.

The project aimed to support safe, compliant, and environmentally responsible infrastructure by conducting field-based environmental measurements, laboratory testing, compliance analysis, and technical reporting.

Across multiple phases, Daira Sabz carried out monitoring covering key environmental parameters such as ambient air quality, noise levels, drinking water quality, surface water quality, and laboratory-based environmental testing.

عنوان پروژه
ESIA مس عینک — فاز اول خط پایه
موقعیت
لوگر، افغانستان
مشتری / شریک
National Engineering Services Pakistan – NESPAK
مراحل اجرا
Phase 1 and Phase 2
بخش
Health Infrastructure, Environmental Monitoring, WASH, Compliance
خدمات ارائه‌شده
Air and noise monitoring, drinking and surface water testing, laboratory analysis, compliance reporting
اجرا شده توسط
Daira Sabz Consulting and Engineering Group
Scope of Services

A complete package of environmental monitoring

Daira Sabz delivered field-based measurement, laboratory analysis, and technical reporting across five core monitoring streams.

Ambient Air Quality Monitoring

Monitoring of key air quality indicators, including:

PM2.5 PM10 Total Suspended Particles — TSP Sulfur dioxide — SO₂ Nitrogen dioxide — NO₂ Carbon monoxide — CO Ozone — O₃

Noise Level Monitoring

Daira Sabz conducted daytime and nighttime noise level measurements using field monitoring equipment to assess environmental noise conditions around project sites.

Drinking Water Quality Analysis

The project included drinking water quality testing for physical, chemical, heavy metal, and microbiological parameters, including:

pH Turbidity Total dissolved solids Chloride, fluoride, nitrate, nitrite, sulfate Conductivity Heavy metals Total coliform, E. coli, and fecal coliform Taste, odor, color, hardness, and selected minerals

Surface Water Quality Analysis

Daira Sabz also conducted surface water quality analysis for parameters such as:

Temperature Dissolved oxygen Chemical oxygen demand — COD Biochemical oxygen demand — BOD₅ Phosphate Sulfide Heavy metals Microbiological indicators

Laboratory Analysis and Reporting

Laboratory testing was conducted in accordance with relevant NEPA, ASQA, WHO, and US EPA standards. The final reporting package included:

Field monitoring data Laboratory results Standard comparison Compliance evaluation Site-specific findings Corrective recommendations where applicable
Project Approach

A practical, standards-based process

Daira Sabz used a practical and standards-based environmental monitoring approach:

  1. 01

    Site Mobilization

    Deployment of field teams, monitoring equipment, sampling tools, and logistical resources.

  2. 02

    Field Data Collection

    On-site measurement of air quality, noise levels, water sampling, and environmental observations.

  3. 03

    Laboratory Testing

    Analysis of selected water and environmental parameters using recognized methods and standard references.

  4. 04

    Compliance Assessment

    Comparison of monitoring results with applicable national and international environmental standards.

  5. 05

    Technical Reporting

    Preparation of environmental monitoring reports with findings, data interpretation, and corrective recommendations.

Key Results

Through this two-phase assignment, Daira Sabz contributed to:

  • Improved environmental compliance for health infrastructure projects
  • Better understanding of air, water, and noise conditions around project facilities
  • Evidence-based reporting for project partners and decision-makers
  • Practical recommendations for corrective environmental measures
  • Strengthened environmental monitoring practice in Afghanistan's health infrastructure sector
Why It Matters

Why This Project Matters

This project demonstrates Daira Sabz's capacity to deliver field-based, laboratory-supported, and compliance-focused environmental services for health, WASH, infrastructure, construction, and donor-funded development projects.

Our Expertise

Daira Sabz Expertise for Similar Projects

دایره سبز خدمات مشابه را برای موارد زیر ارائه می‌دهد:

  • Health centers and hospitals
  • WASH and water supply projects
  • Construction and road projects
  • Renewable energy and solar projects
  • Mining and industrial projects
  • Schools and public buildings
  • UN, NGO, donor-funded, government, and private sector projects

خدمات مرتبط ما شامل موارد زیر است:

  • Environmental Monitoring
  • Environmental and Social Impact Assessment — ESIA
  • Initial Environmental Examination — IEE
  • Environmental Baseline Surveys
  • Air, Water, Soil, and Noise Testing
  • Drinking Water and Wastewater Analysis
  • Environmental Management Plans — EMP/ESMP
  • Construction Environmental Supervision
  • Occupational Health, Safety, and Environmental Support
  • ESG, Climate, and Sustainability Advisory
Project Gallery

Environmental monitoring in action

A selection of fieldwork, sampling, testing, and site activities completed during this assignment.

Explore More Projects

Explore similar environmental assignments

Browse additional projects from the same category to see how Daira Sabz delivers comparable technical support.
بررسی اولیه محیط‌زیستی

ارزیابی اثرات محیط‌زیستی و اجتماعی پروژه برق‌آبی باغدره

خدمات مشورتی قراردادی برای MJAM در پروژه پیشنهادی برق‌آبی باغدره در کاپیسا و پروان، شامل ارزیابی محیط‌زیستی و اجتماعی، برنامه‌ریزی تدابیر حفاظتی و مشارکت ذی‌نفعان.

کاپیسا و پروان، افغانستان

بررسی اولیه محیط‌زیستی

ارزیابی اثرات محیط‌زیستی و اجتماعی پروژه مرمر، اونیکس و تراورتین هرات

ارزیابی محیط‌زیستی و اجتماعی پروژه مرمر، اونیکس و تراورتین شرکت غزنوی فراه در هرات، شامل مطالعات ابتدایی، آزمایش‌ها، مشوره با ذی‌نفعان و پشتیبانی روند بررسی NEPA.

هرات، افغانستان

شروع پروژه ارزیابی

به دید روشنی از ریسک‌ها و اثرات پروژه خود نیاز دارید؟

چه بررسی پایه، IEE، ESIA کامل یا مطالعه تخصصی محیط‌زیست نیاز داشته باشید، دایره سبز رویکرد ارزیابی متناسب با پروژه، الزامات قانونی و ذینفعان طراحی می‌کند.