Project scope
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Daira Sabz provided environmental monitoring services for health centers in Herat under a two-phase sub-consultancy with NESPAK. The assignment combined field measurements, sampling, laboratory analysis and technical reporting to support safe and environmentally responsible health infrastructure.
Ambient air quality monitoring (PM2.5, PM10, TSP, SO₂, NO₂, CO and O₃); daytime and nighttime noise measurements; drinking water testing; surface water analysis in Phase 1; laboratory analysis and compliance reporting.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Field teams mobilized monitoring equipment and collected environmental measurements and water samples. Results were assessed against applicable national requirements and relevant NEPA, ASQA, WHO and US EPA reference standards, with site-specific findings and corrective recommendations.
Daira Sabz provided environmental monitoring services for health centers in Herat under a two-phase sub-consultancy with NESPAK. The assignment combined field measurements, sampling, laboratory analysis and technical reporting to support safe and environmentally responsible health infrastructure.
Field teams mobilized monitoring equipment and collected environmental measurements and water samples. Results were assessed against applicable national requirements and relevant NEPA, ASQA, WHO and US EPA reference standards, with site-specific findings and corrective recommendations.
Reliable environmental evidence supports safer health facilities, informed decisions and practical corrective action.
Reliable environmental evidence supports safer health facilities, informed decisions and practical corrective action.
Contracted consultancy for MJAM on the proposed Baghdara Hydropower Project in Kapisa and Parwan, covering environmental and social assessment, safeguards planning and stakeholder engagement.
Kapisa and Parwan, Afghanistan
Environmental and social assessment for Ghaznawi Farah’s marble, onyx and travertine project in Herat, combining baseline studies, testing, consultation and support for NEPA review.
Herat, Afghanistan
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Arghandi, Paghman, Kabul, Afghanistan
Reliable environmental evidence supports safer health facilities, informed decisions and practical corrective action.