ISO 14001:2015
Environmental Management System, independently audited and annually renewed
Strengthen infrastructure decisions through technical design, site evidence, testing and quality oversight.
German operations provide consulting, engineering and technical supervision. Daira Sabz Afghanistan can undertake construction implementation where contracted. We support feasibility, design, scheduling, quality control and environmental safeguards, with roles defined in each agreement.
Environmental Management System, independently audited and annually renewed
Quality Management System, applied across all project phases and deliverables
Authorised to conduct EIA/ESIA under Afghanistan's national environmental framework
Recognised for tax compliance and eligibility for public-sector contracting.
Eligible vendor for national public procurement processes.
Engineering, project management and technical supervision for roads, buildings and utilities, with construction delivery through Daira Sabz Afghanistan where contracted.
Field and laboratory testing of construction materials to support quality control, specification review and engineering decisions.
Four reasons clients choose us for this practice area.
Technical, environmental and social considerations are assessed together.
Methods, applicable requirements and outputs are defined for the assignment.
Field data, analytical tools and stakeholder perspectives inform recommendations.
Germany provides consulting, engineering and supervision; Afghan construction delivery is separately contracted.
Share the project location, stage, objectives, available studies and the decisions you need to make.
Yes. Relevant technical, environmental and social services can be scoped together for the assignment.
Applicable legal, client and lender requirements depend on location, sector and contract. They are confirmed during scoping.
Timing and fees depend on the scope, fieldwork, data availability, methods and review requirements. These are agreed for the assignment.
Germany provides consulting, engineering and technical supervision. The Afghanistan organisation undertakes construction where contracted.
Contact the team with your project brief so the scope, deliverables and next steps can be agreed.
Environmental and social assessments, climate advisory and resource management for responsible development.
Geological studies, geotechnical investigations and mining engineering informed by environmental and social evidence.
Digital workflows, environmental monitoring and spatial analysis that turn project data into useful insights.
Social studies, programme evaluation, project management and capacity development for informed policy and investment decisions.
Share your objectives, location and project stage. We will define the relevant scope, team and deliverables with you.