Salang Corridor — Biodiversity Baseline Assessment

Biodiversity baseline work for SMEC International on the Salang Corridor, covering flora, fauna, habitats, potential impacts and mitigation recommendations.

Salang Corridor — Biodiversity Baseline Assessment
Project Overview

Supporting safe, compliant health infrastructure

Daira Sabz Consulting and Engineering Group provided environmental monitoring services under a structured sub-consultancy assignment with an international engineering partner.

The project aimed to support safe, compliant, and environmentally responsible infrastructure by conducting field-based environmental measurements, laboratory testing, compliance analysis, and technical reporting.

Across multiple phases, Daira Sabz carried out monitoring covering key environmental parameters such as ambient air quality, noise levels, drinking water quality, surface water quality, and laboratory-based environmental testing.

Project Title
Salang Corridor — Biodiversity Baseline Assessment
Location
Salang Corridor, Afghanistan
Client / Partner
SMEC International Pty Ltd
Implementation Phases
Phase 1 and Phase 2
Sector
Transport Infrastructure, Biodiversity, Environmental Assessment
Services Provided
Flora survey, fauna survey, habitat assessment, biodiversity baseline, impact assessment, mitigation recommendations
Implemented By
Daira Sabz Consulting and Engineering Group
Scope of Services

Biodiversity baseline survey scope

Daira Sabz delivered field-based measurement, laboratory analysis, and technical reporting across five core monitoring streams.

Ambient Air Quality Monitoring

Monitoring of key air quality indicators, including:

PM2.5 PM10 Total Suspended Particles — TSP Sulfur dioxide — SO₂ Nitrogen dioxide — NO₂ Carbon monoxide — CO Ozone — O₃

Noise Level Monitoring

Daira Sabz conducted daytime and nighttime noise level measurements using field monitoring equipment to assess environmental noise conditions around project sites.

Drinking Water Quality Analysis

The project included drinking water quality testing for physical, chemical, heavy metal, and microbiological parameters, including:

pH Turbidity Total dissolved solids Chloride, fluoride, nitrate, nitrite, sulfate Conductivity Heavy metals Total coliform, E. coli, and fecal coliform Taste, odor, color, hardness, and selected minerals

Surface Water Quality Analysis

Daira Sabz also conducted surface water quality analysis for parameters such as:

Temperature Dissolved oxygen Chemical oxygen demand — COD Biochemical oxygen demand — BOD₅ Phosphate Sulfide Heavy metals Microbiological indicators

Laboratory Analysis and Reporting

Laboratory testing was conducted in accordance with relevant NEPA, ASQA, WHO, and US EPA standards. The final reporting package included:

Field monitoring data Laboratory results Standard comparison Compliance evaluation Site-specific findings Corrective recommendations where applicable
Scope of Services

A practical, standards-based process

Daira Sabz used a practical and standards-based environmental monitoring approach:

  1. 01

    Site Mobilization

    Deployment of field teams, monitoring equipment, sampling tools, and logistical resources.

  2. 02

    Field Data Collection

    On-site measurement of air quality, noise levels, water sampling, and environmental observations.

  3. 03

    Laboratory Testing

    Analysis of selected water and environmental parameters using recognized methods and standard references.

  4. 04

    Compliance Assessment

    Comparison of monitoring results with applicable national and international environmental standards.

  5. 05

    Technical Reporting

    Preparation of environmental monitoring reports with findings, data interpretation, and corrective recommendations.

Key Results

Through this two-phase assignment, Daira Sabz contributed to:

  • Improved environmental compliance for health infrastructure projects
  • Better understanding of air, water, and noise conditions around project facilities
  • Evidence-based reporting for project partners and decision-makers
  • Practical recommendations for corrective environmental measures
  • Strengthened environmental monitoring practice in Afghanistan's health infrastructure sector
Why It Matters

Why This Project Matters

This biodiversity baseline assignment demonstrated Daira Sabz's capacity to conduct field-based flora and fauna surveys using internationally accepted environmental assessment standards, producing decision-ready outputs for transport infrastructure development.

Our Expertise

Daira Sabz Expertise for Similar Projects

Daira Sabz provides similar services for:

  • Health centers and hospitals
  • WASH and water supply projects
  • Construction and road projects
  • Renewable energy and solar projects
  • Mining and industrial projects
  • Schools and public buildings
  • UN, NGO, donor-funded, government, and private sector projects

Our relevant services include:

  • Environmental Monitoring
  • Environmental and Social Impact Assessment — ESIA
  • Initial Environmental Examination — IEE
  • Environmental Baseline Surveys
  • Air, Water, Soil, and Noise Testing
  • Drinking Water and Wastewater Analysis
  • Environmental Management Plans — EMP/ESMP
  • Construction Environmental Supervision
  • Occupational Health, Safety, and Environmental Support
  • ESG, Climate, and Sustainability Advisory
Project Gallery

Environmental monitoring in action

A selection of fieldwork, sampling, testing, and site activities completed during this assignment.

Explore More Projects

Explore similar environmental assignments

Browse additional projects from the same category to see how Daira Sabz delivers comparable technical support.
Initial Environmental Examination

Herat Marble, Onyx and Travertine Project — ESIA

Environmental and social assessment for Ghaznawi Farah’s marble, onyx and travertine project in Herat, combining baseline studies, testing, consultation and support for NEPA review.

Herat, Afghanistan

Start an assessment project

Need a clear view of your project's risks and impacts?

Whether you require a baseline survey, Initial Environmental Examination, full ESIA or specialist environmental study, Daira Sabz can develop an assessment approach aligned with your project, regulatory obligations and stakeholder requirements.